GCA provided a full package of Structural, Highways, Drainage and Retaining Wall design services for the redevelopment of a complex site into a flexible-use leisure park unit, with an initial trampoline park tenant.
GCA provided a combined scope of works which integrated the foundation, drainage and structural designs to ensure a consistent and economic approach to the construction of the project.
The sloping site was managed through cut\fill assessments which were balanced with the setting of site levels, plateaus, and economic use of retaining walls.
Engagement with the local authorities ensured that interfaces with highways and drainage systems were integrated and agreed to avoid site delays.